Structural Engineer at Rebartek AS, November 2018 – present moment
Main responsibilities:
perform calculations of concrete elements, change design in accordance to robotic production;
make simulations and programs for robotic production;
being in charge of production, training and supervising people, ordering materials, working with Customers;
make calculations and design of hardware (frames for robotic cell, grippers, feeders, resistance welding tool, jigs etc.);
participate in exhibitions and conferences, investor searches;
Achievements:
Taught and supervised team how to read drawings, sequences and methods of manual production;
Developed system of production control and time management at the factory;
Arranged production process and successfully produced more than 6 tons of rebar cages;
Made first approaches in development of the vision system for rebar crosses recognition;
Designed and manufactured small-scaled production unit (3x3x1.8 meters) with two robots;
Organized manufacturing of reinforcement cages in Søgne and Hønefoss.
Structural Engineer (freelancer), April 2018 – November 2018
Main responsibilities:
perform calculations of building frameworks along with checking structural elements, foundations and joints;
design structural solutions;
execute working drawings;
create structural BIM of buildings.
Accomplishments:
reconstruction of the tennis court "Roland Garros", Paris, France;
reconstruction of the roof structures ‘Sanduny’ bath houses, Neglinnaya st. 14, Bl. 4, Moscow, Russian Federation;
creation of a BIM and design Multifamily condominium 29a in residential complex ‘Simvol’ placed on former territory of ‘Serp i Molot’ factor, Lefortovo, Moscow, Russian Federation;
calculation and design of two-axes tracker for solar panels (with the possibility of construction in the southern part of Ukraine); · creation of a BIM and design Construction of a residential complex with built-in commercial premises (first stage) on a land plot on the street. M. Pimonenko - st. Pasichnaya in the garden association "Geologist", Lviv, Ukraine;
calculation and design of single-axis tracker for solar panels (with the possibility of construction in the southern part of Ukraine).
Senior Structural Engineer at ‘ZV Development’, Kyiv, Ukraine, May 2017 – April 2018
Main responsibilities: BIM modeling and management; executed calculations; managed the team of structural engineers
Achievements:
Redesigned project of the company office that contained few serious mistakes in calculations;
Integrated BIM into design process including trouble solving to increase productivity;
Executed scientific research of buildings made of prefabricated concrete panels (three-layered precast wall panels + ‘Filigran’ technology) to optimize production processes for a concrete structures factory;
Generated and provided solutions for concrete soundproof shields along the roads.
Senior Structural Engineer at ‘Derffer’, Kyiv, Ukraine, July 2014 – May 2017
Main responsibilities: performed calculations and working drawings; elaborated structural solutions; created structural BIM in coordination with adjacent (architect and MEP) specialists; provided manage function; made presentations for potential Customers
Achievements:
Reduced ~10% working time in the danger nuclear zone by optimizing solution of reinforcement cages and precast trays in the project of the North Firewater Collection Pond, Chernobyl Nuclear Power Plant (ChNPP), Ukraine;
Excluded reinforcement collisions by persuading company management to use BIM in project of Fire Subdivisions Access Lock, ChNPP, Ukraine;
Reduced time of structure design up to 20% by creating BIM in project of sewage system for ‘Tver Marina’ complex, Lenovo-Poddub’e, Tver region, Russian Federation:;
Created design standard for the project that improved coordination of team members and reduced design time on 5% in project of Commercial and logistic center ‘Leroy Merlin’, Lubertsy, Russian Federation;
Provided wide research of dynamic impacts of ice avalanche and appearing ground collapses under the facility in project of South Storm Water Catching Basin, ChNPP, Ukraine;
Arranged simultaneous work between adjacent specialists for Logistic center LLC ‘BATISIBIR’ project, Novosibirsk, Russian Federation;
Consolidated $5,000 by optimizing structural solutions and fast implementing changes of BOQ in project of the cosmetic factory “L’Oreal”, Kaluga, Russian Federation.
Structural Engineer at ‘V. Shimanovsky Ukrainian Institute of Steel Construction’, Kyiv, Ukraine, October 2009 – July 2014
Main responsibilities: executed calculations of building frameworks, elements and joints; prepared reports of site inspections; performed design drawings
Achievements:
Reduced analyzing time of the elements of complex spatial roof structure on 10% by creating macros in project of steel roof structures of the football stadium “Arena Lviv”, Lviv, Ukraine;
Examined conditions of the structures of the Monument “Nezalezhnosti” (Independence Monument), Kyiv, Ukraine;
Reduced quantity of steel structures after recalculation on 5% of the “Danylo Halytskyi International Airport” project, Lviv, Ukraine;
Co-authored solution of installation scheme in project of the open-air theatre “Rakushka” (2000 spectator seats), Zhitomir, Ukraine;
Reduced weight of the steel structures for ~10 tons by approving solution of light covering with Customer in project of reconstruction of non-residential building, Kyiv, Ukraine.
Trainee Civil Engineer at ‘Architecton’, Vinnitsa, Ukraine, March 2008 – February 2009
Main responsibilities: prepared drawings, on-site inspections; prepared reports.